FEATURED PROJECT: RONALD McDONALD HOUSE of DURHAM NEW EXPANSION

Comfort Engineers Construction Division is pleased to be working for Skanska USA Building Inc. on the 24,000 SQ FT expansion of the Ronald McDonald House of Durham.  We are responsible for the heating and air conditioning system being installed.  Spring Stoops McCullen Engineering, PA  of Durham designed the systems that  we are installing.  We are using a Daikin VRV System alongside a Greenheck Energy Recovery Ventilator, both purchased from Hoffman & Hoffman, Inc.  The Daikin system consists of 6 Condensing units, 52 Fan Coil Units, Branch Selector Boxes and what seems to be a couple miles of refrigerant piping.  The Energy Recovery Ventilator is providing conditioned make up air to the guest suites and is recovering heat from the toilet exhaust.  The building is a wood framed building which creates several challenges with routing, sealing and fire stopping penetrations.  The schedule is for the new expansion to be ready around Mid July.  Below are some pictures of the progress, check back later for more pictures.

This slideshow requires JavaScript.

Posted in Projects | Leave a comment

Comfort Engineers Inc. Featured Projects

Welcome to Comfort Engineers Inc. Featured Projects Blog.  The purpose of this blog is to share our work with everyone.  We will be adding featured projects to the blog so everyone can see what we’ve been up to and what we are currently working on.  We look forward to showing you our duct and pipe installation, our metal fab capabilities, the types of equipment we service and much more.  We hope that you will enjoy this blog and looking through a wide variety of our projects.

Thank You

Posted in Introduction to Blog | Leave a comment